Cost of Ontario Science Centre temporary location exceeds cost of roof repairs
The time required to set up a temporary location will mean that there is no Science Centre location for two years; the RFP also reveals that a new Science Centre at Ontario Place would not be ready until 2030-2034.
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed