New Paddock F1 Grand Prix du Canada
Les Architectes FABG

Named in honour of the Canadian auto racer, the raceway is located on Notre-Dame Island, the former site of Expo 67. In the decades since that pivotal event, the island has been gradually transformed into a park with various attractions, including a casino, public beach, Olympic rowing basin and military museum. When it is not hosting the Formula One race, the four-kilometre roadway is popular as an informal training track used by amateur cyclists.
As part of a renewal agreement for the Canadian Grand Prix, the City of Montreal has committed to replacing the temporary structures currently used for the race with a permanent building that will accommodate the needs of the event. The new paddock will include garages for the racing teams, offices for the Federation internationale de l’automobile, which organizes the event, rooms for the race sponsor, lounge space for 5,000 people, and a media center for journalists and broadcasters. All of the building’ interior furnishings and equipment are shipped from abroad and installed for the duration of the event.



Download Project PDF
Jury Comments
David Penner :: I really admire the way the exposed wood roof structure speeds along the raceway. It works at the almost-sublime scale of the speedway and celebrates the event of the Grand Prix.
Monica Adair :: If the Grand Prix isn’t exciting enough, this project further elevates the spirit of the sport. The structure is a powerful branding icon for the site and F1, putting architecture on par with the captivating spectator sport, all while showing a capacity for restraint. Also impressive is the plan to tackle environmental sustainability by minimizing the use of mechanical systems—a progressive approach that you wouldn’t necessary expect from F1.
Ted Watson :: It’s a very satisfying response to the program, while also delivering a clear legibility, making great spaces and a strong identity for the project type. It’s a beautiful bar, the resolution of the plan is clean, the sections are compelling, and the use of the wood system is powerful and cost-effective.
Credits
STRUCTURAL/MECHANICAL/ELECTRICAL/CIVIL:: CIMA+
AREA:: 22,235 m2
BUDGET:: $47 M
STATUS:: Under construction
ANTICIPATED COMPLETION:: June 2019
View within Canadian Architect magazine’s December 2018 Awards Issue: